The restoration works at the İstanbul Maiden's Tower (Kız Kulesi) are carried out under the supervision of our Ministry and of academicians who are experts in their field. The project was conducted in accordance with universal protection principles and with approved projects, using data obtained during the work that was evaluated with utmost care. As a result of the data obtained within the scope of these works, static reports were prepared by academicians working at İstanbul Technical University (İTU) and Fatih Sultan Mehmet University (FSMVU) to evaluate the current situation of the structure, and a report was prepared by the Advisory Committee to evaluate the proposed intervention from an architectural perspective. You can access the reports here.
The Restoration of the İstanbul Maiden's Tower (Kız Kulesi), Exhibition Arrangement and
Landscaping Work, which started in 2021, was completed on May 11, 2023. The work was carried
out in accordance with the projects approved by the conservation board under the supervision
of the T.R. Ministry of Culture and Tourism. These projects aimed to restore the tower to
its original state by removing subsequent additions that were not in accordance with its
original character. Experts in their fields, Prof. Dr. Zeynep Ahunbay, scholar of
antiquities, Prof. Dr. Feridun Çılı, professor of engineering at İTU, and the architect, Han
Tümertekin, provided support as consultants. The details of the renovation and arrangement
are as follows:
• The Maiden's Tower has undergone various repairs over time. In 1944, the original
wood floor coverings, and the cone structure were renovated with concrete, the most popular
material of the time. In the 2000s, repairs were carried out including roof additions for
the restaurant inside the structure and the steel cross reinforcement elements added to the
outer walls of the tower after the 1999 earthquake.
• The concrete and cement used in 1944 damaged the structure over time due to its salt
and chemical content. The restoration works were carried out in accordance with original,
natural materials, and the concrete was removed.
• In past repairs, the column and floor were connected, using sand containing
seashells. The concrete prepared by hand 80 years ago has lost its properties due to errors
and shortcomings in the formulation. In addition, the non-ribbed iron accessories corroded
creating cracks to the structure and the flagpole (See Figures 1-2-3-4-5-6).
• In light of this information, it became clear that in the event of a major
earthquake, the Maiden's Tower, a symbol of İstanbul, would be severely damaged.
• Throughout the recently completed restoration works, documents and data were studied
from original sources. Some of the resources that had survived until the present day were
from the end of the 18th century.
• The steel roof and mezzanine floor, which were added to the castle courtyard section
in the 1990s, were disassembled and removed. The dismantling of the reinforced concrete
sections, which were added around the same time, has also been completed.
• After the suspension-closing scaffolding was installed, the reinforced concrete
structure located in the front part of the structure with non-original reinforced concrete
inserts was dismantled. More than five hundred tons of reinforced concrete parts, including
the flagpole and the balcony elevation, were carefully removed without any damage to the
original structure. These sections have been restored to their original state with masonry
and wood in line with approved projects, and the resulting structure was made more
earthquake resistant.
• Throughout the reconstruction processes, georadar (ground penetrating radar), imaging
systems, laser scanners, chemical analysis, and all kinds of technologies were used to
protect the structure. (See Fig.7).
• Previously, since wall cavity imaging systems were not available, it was not possible
to detect the gaps and cracks that had formed in the walls and floors. For this reason, the
gaps in the wall structure could not be stabilized in past periods, or during the repairs
made in the 1940s.
• The original walls, in which gaps were observed during the georadar work, were
strengthened with injection moulding. One hundred-twenty tons of injection material was
used, paying attention to the condition of the original materials and the tower’s presence
in the middle of the sea.
• The walls of the structure were strengthened with invisible stainless steel during
the core cutting project. The non-original steel belts on the facade added to the structure
at the end of the 1990s, have also been removed. (See Fig.8).
• At the guidance of our consultants, cement-based joint manufacturing was removed from
the structure, and the lost crenels (notches in the castle wall used during battles)
discovered on the walls have been uncovered. (See Figure 9).
• The part of the flagpole starting from the balcony floor and up to the upper level of
the dome is made of metal.
• During conservation works on the copper crescent and star, gold leaf residues were
detected. It was again covered with gold leaf during restoration efforts. There is no
lightning rod in this outstanding monument. Because of this, lightning strikes have damaged
the pole and caused serious cracks over time. All measures have been taken to remedy this
situation on this important symbol of İstanbul. (See Figure 10).
• After the tower is reopened people will be allowed to view İstanbul while walking
around the wooden covertways in the courtyard or by climbing the wooden stairs of the tower.
• It was determined that the northern waves crashing onto the island caused cracks by
dragging the previous fortification material from under the island back up to the island. In
addition, the sea depth in the north-western corner of the island is around thirty meters
which has also caused the fortification materials to shift. Along with these issues, the
piers located around the island were built on top of the old piers at the end of the 1990s,
and for this reason, the underlying carrier piers have collapsed in places. To remedy this
situation, solutions have been developed in consultation with the General Directorate of
Infrastructure Investments of the Ministry of Transport. Studies been conducted on the
condition of the ground, and construction has been carried out for the environmental
fortification of the island and the improvement of its piers. (See Figures 11-12-13-14).
• Work for the renewal of clean water and electricity lines to the island has started.
• Since there was previously no sewage treatment unit or access to sewerage, necessary
work has been done to remedy this issue.